Skip to content

Control: ism-0217; Revision: 5; Updated: Mar-23; Applicability: TS; Essential Eight: N/A

Where spatial constraints demand non-TOP SECRET patch panels be installed in the same cabinet as a TOP SECRET patch panel:

  • a physical barrier in the cabinet is provided to separate patch panels
  • only personnel holding a Positive Vetting security clearance have access to the cabinet
  • approval from the TOP SECRET system’s authorising officer is obtained prior to installation.